It's 12th today.

Today, we finally sat down with Steven and went through a thorough discussion.

We have seen the more satisfying 3D drawing and made the necessary amendment. Also, we selected the laminates for the shoe cabinet, kitchen cabinet, one wardrobe and one vanity cupboard. We finalised the ceiling lightings and electrical points too. Last but not least the rooms doors. So we are left with the carpet and laminate floors.

According to Steven, the wall to make the MBR bigger and 2 panels of wall at study were hacked.

Mr bf and I am still considering over the floor tiles- now over black and grey. Yes, please bear with us. Anyway, tiling work should start next week after the Vesak Day PH. Yes!

Tomorrow, I will be looking at some wallpapers. =)