Saturday, May 31, 2008

Kitchen

I am considering not to build cabinets at the top at where my hood is. I am looking for some thing that gives a cleaner and less complicated look.

Wednesday, May 28, 2008

Tiling in Progress

After so much so much had happened, so much so much time wasted, so much so much changes, the tiling finally began on Monday.

Sunday, May 25, 2008

Serta

oh... Instead we bought the mattress from Serta.
It's called Sierra Hill.

Happy. =)

Friday, May 23, 2008

At IMM

We went to IMM today. Basically, we went to see the mattresses as there are most brands under the same roof. We shortlisted one bed each in Sealy, Simmons and Serta. He like medium firm and I like it firm. However, I can accept any except plushy soft one.

Simmons and Sealy are having promotion, of which, I find Simmons sales is rather attractive for the GSS.

I have liked Simmons ever since the first time I tried in it Marina Sq. Today, I gave myself a chance to make a comparison. To my pleasure, he prefers Simmons too.

I'm glad, we have most likely settled our mind on mattress. No much of fuss. Now, we hope we could arrange delivery by 31st July to get additional $100 discount.

After that, we went around to see some furniture. A few dining tables that caught our eyes. We saw a fabricated XZQT bedframe which put us into consideration.

Sunday, May 18, 2008

Kitchen and Entertainment Area

The delayed 3D drawings.

Tuesday, May 13, 2008

3D Drawings

The 3D drawings have arrived...

Monday, May 12, 2008

It's 12th today.

Today, we finally sat down with Steven and went through a thorough discussion.

We have seen the more satisfying 3D drawing and made the necessary amendment. Also, we selected the laminates for the shoe cabinet, kitchen cabinet, one wardrobe and one vanity cupboard. We finalised the ceiling lightings and electrical points too. Last but not least the rooms doors. So we are left with the carpet and laminate floors.

According to Steven, the wall to make the MBR bigger and 2 panels of wall at study were hacked.

Mr bf and I am still considering over the floor tiles- now over black and grey. Yes, please bear with us. Anyway, tiling work should start next week after the Vesak Day PH. Yes!

Tomorrow, I will be looking at some wallpapers. =)

Sunday, May 11, 2008

Fridge | Washer & Dryer

We are back last night.

Today, we went to LifeStorey and Molecule at Great World City. Nothing really caught our eyes.

Sunday, May 4, 2008

So far that's it.

Hacking by our ID should start next week.

Next appointment around 12th, after we come back from holiday. We should be seeing 2nd 3D drawing, planning of electrical points and tile work should also begin shortly after.

Goodbye world.

Saturday, May 3, 2008

1st drawing= NG

Appointment began at 9:00pm and ended 11:00pm.

The 3D drawing did not turn out to our likings. I do not like too many lines, or groove on one feature. One color is good enough to thrill me. It is quite a distance away from what we had in our mind.

Nevertheless, hacking will start within this few days. Another 3D drawing to preview in another 10-12 days. Tiling should begin shortly after.

We sat at one kopitiam, went into tension discussions. We should get it right real soon. We must!

Thursday, May 1, 2008

Black or White?

Just for self reference.