Wednesday, April 30, 2008

It's our dream home.

The new Home & Decor magazine is out! We have never missed an issue when we started to think of our renovation. And why do I especially talk about this issue is because there is a home featured in it which is almost near to our dream home- titled Creative Home!

The black floor tiles which mr bf likes and the white brick wall which I heart.

We ever told our ID about our likings, but have no courage and no idea how to move on with it. At this stage, we lagi have no courage to tell our ID and make the tremendous change.

Actually, there is a similarity there. We will also be doing the raw cement look for our foyer, except that it is not extending into the kitchen. That quirky bookshelf as a divider, I have ever asked for a more symmetrical one from our ID, but it's going to cost us $1680, thus, we kept it under optional.

So, it's only the floor tiles that we need to change isn't it? If we are going to change it, it would be the 6th time we visit Hafary liaoz... keke... and it will be the 5th time we change our mind for the living/ dining floor tiles liao.

Now now, what should we do? Both me and mr bf in dilemma again. Should we copy and paste? Should we stick to the current? Ahh... why the 3D drawing took so long to come out? ok ok... I think we shall wait for the 3D drawing and decide.

Saturday, April 26, 2008

What is next?

Tugged myself in the forum, reading up on lightings, washing machine and fridge. I think my hair is going to drop a little more than usual, more fine lines are going to reveal and my forehead is not going to stop breaking out.

Now, we need to discuss if a dryer is necessary.

Friday, April 25, 2008

Purchases at Teka

Teka is having a Store Wide 20% Sales, with selected items up to 60% off. I asked about the coming GSS. The sales exec said this is even more attractive than GSS. Don't know true or not. Anyway, I still made my purchase today. A bit Kiasu. And, I made the decision without Mr Bf.

1) Tempered glass hob. May consider a 2 burner one. The length is 86cm. Find it a bit long.

2) Hood at 90cm. May change to 70cm if I am changing the hob.

3) This is like a compact size oven. Smaller than the normal conventional oven. Can bake spring chicken. I think it's just nice for the 2 of us. Didn't think I will need an oven, but Mr Bf wants it.
It's a great buy. Usual Price was $1200 and it is now having a 41% discount! Sales person told us we bought the last set. Like it's stainless steel finishing. Not digital though. But it's ok lah, as long as it looks clean and neat can liaoz....

Tuesday, April 22, 2008

No! No! It's not a tile!

Weee... My dad just came home with a little surprise.

The Korean Solid Surface Top Sample!! Yup yup... my dad is working with this company that does solid surface top. =)
Did I forget to mention that my parents are late night owls? Inherited.

Monday, April 21, 2008

Jalan Besar | Hafary

Hello!!

Today, at Jalan Besar, we dropped by Royal Franco and Poh Joo to understand better about the kitchen sink and tap, wc and basin, hob, hood and oven. It's quite an eye-opening for two big children like us... hehe.... After consulting our ID, we would required to get the hob, hood and oven first for the carpenters to take the dimension. Most likely, we would choose between cuizino and rinnai. Mr Bf doesn't like tempered glass hood, so only stainless steel. *shrugged*

Oh yes, and lighting is part of the top priority too.

It's the 4th time I stepped into Hafary. We must have broken the record. Steven and Max made time to meet us there. The golden hair disciple was with them too. The tile selection is FINAL! We told ourselves- No more changes!!!

1) Living/ Dining Floor tiles- we changed to $2.90 psf

2) Kitchen Floor - Love this tile. It's recommended by the sales girl and we almost use this for our living flooring to create the urban rustic look. After much discussion, our ID still think a whiter tile will suit our house better.

3) This is for common toilets. The top row are for walls. The bottom is tile and pebbles for the floor. Wall tiles looks warm beige in actual. Mind my phone camera. =p Softer and more subtle as compared to my MBR's. More comfortable to the eyes.
4) Lastly, MBR wall and floor tiles. We have changed to another rustic looking tile to replace the previous one. Max was quite fascinated by it. I hope it will turn out well.
That's about it. It's final!!! And we shall sit and wait for the 3D drawing and lighting plan in early May. =)

Thursday, April 17, 2008

The Proposed Layout.

Realised that I did not receive a proposed layout, hence I asked for one from Steven.

(Read more...)

Wednesday, April 16, 2008

2 Hours @ Hafary

We spent for almost 2 hours!! And it was the master bedroom toilet's tiles that took us the longest. The 3 men like a funky and modern toilet when I like it warm and elegant. I am dead beat. He is complaining headache already. Max was telling Steven it is so difficult to catch the style of our liking. I total agreed with him because we are fickle, especially me. I like anything that is nice despite of concept. hehe....

By looking at the sample, I am also wondering what took us this long. Now, the tiles look almost similar to me. Duhz. No mosaic, no prints, just 2 different type of tiles each, for both common and MBR toilets.

1) The common toilet wall and floor tiles. The fastest decision made for because we are tired already. We agreed on every ideas provided by Steven.

2) These are the ones that gave us headache. MBR toilet tiles. Colors chosen by me. Design idea given by Max. The more I look at the contrast the more I like it. I told Mr Bf to be prepared for a simple but yet dramatic toilet. It's not a safe play. Hopefully, it will turn out nice.

3) Kitchen floor tiles. Not too difficult. Mr Bf like it and Steven strongly recommended it. Thus, I agreed to it.

4) Lastly, Living/ Dining homogeneous tiles. Mr Bf did not mind topping another $0.60psf for this. It's whiter and nicer. Quickly, I agreed to it. =p

Expecting to see the 3D drawings in early May only. That's about 2 weeks! Embrace.

Monday, April 14, 2008

Renovation List.

Let's just roughly go through the list of renovation items.

Living/ Dining
Full height feature wall for bomb shelter c/w tic-tac door.
Sliding door to incorporate to house-hold shelter feature wall in laminate finish.
Full height TV feature wall with both side laminated c/w swivel TV mechanism.
Low height TV console c/w drawers.
Shoe Cabinet at foyer entrance.

Study/ Main Balcony
Hack existing wall to study room entrance.
Install partition wall to study room entrance.
Raised up 4"platform at study room.

MBR and Bedroom 2
Hack of existing wall to make a bigger MBR.
Raised up 4" platform in MBR.

Kitchen
Mainly supplying tools and labour.
Design and Casement door to kitchen entrance.

MBR and common Bathroom
Low ht vanity counter.
Tempered glass panel to shower area.

Eh, I still do not have the original quote with me. And I am lazy type out every items in the quote. I wish I could do a copy and paste. Hehe... :p

Total sum is $39k including all false ceiling and L-box, electrical, homogeneous floor and wall tiles for kitchen and toilets. However, it excludes the solid surface top, MBR wardrobe and a custom made bookshelf, which are under optional. =)

Tuesday, April 8, 2008

ID? Checked!!!

Today, we confirmed our ID with Steven from Ideal House at $39k. Next Wednesday, will mark the beginning of the whole process of renovation- Tiles shopping! Yeah!

Saturday, March 29, 2008

Evening Gown | Video man

The first time, it was 2 wedding gowns. Yesterday, it was 2 evening gowns.
Sneakily, I asked her to take a picture for me in the tiny and messy dressing room.

This is feature in their bridal show last week. On me, the color is wrong. The cutting is nice. I need bigger push at my b**bs. A slimmer waistline and a flatter tummy will look more flattering. I would most likely made to measure my evening gown. Yvonne says, she will design something that looks sexy for me. She seriously thinks that I suit sexiness. (with my flat chest?) Fine, at least, I want something different from the princess looking day gown for the evening. My next appointment will only fall in June, that's when they have newer gowns again.

I have finalised. Alex from EmotionPix would be the video man on my actual day. Yeah! =)

Wednesday, March 26, 2008

He calls this his daughter's drawing

Bear with me, please bear with me. The no scale and no skill, but it's still with inspiration.

Errrr........

Reno is yet to start.

Many were asking how is our renovation getting on. All I could say is nothing has started yet. We have not even signed any contract yet.

We are most likely going to confirm Ideal House as our ID.
All we need to look for is one off day together to meet up with Steven who just return from reservist.

I tugged myself in renotalk recently, and realised many went through thorough check of the house when they first gotten the key. Mr fiance and I did not do that and now I am getting a bit worried.

Hopefully, we could get everything started real soon.

Sunday, March 23, 2008

Yvonne Creative Bridal Show.

Despite of the tiredness, Charlene accompanied me to watch Yvonne Creative's Bridal Show at Vivocity yesterday. They are quite lovely. Only manage to take pictures of the last segment of the show, with my pathetic Samsung mobile phone.


I tried this gown on my first appointment. I looked nice in it. It's also featured in Bliss Wedding or is it Style Wedding magazine for this quarter. =)



This is another gown that we like. But the details cannot really be seen from this pic. It's nice too. =)

By the way, she is Lisa Wong. Miss Singapore Universe (200?) She looks pretty and confident in real. The gown she is wearing is same as above if you cannot tell from the poorly taken pictures. Ha.

It was crowded. So many people are getting married. The booths are packed. I really hope to make appointment and "chopped" the gown before anyone would have chosen it before me but mr fiance is not free. Felt very much like going down and choose one on my own but the sweetness of choosing a gown together will be lost. =( So, what should I do?

Leave it to fate.

Tuesday, March 18, 2008

Ideas! Steal!

Steven from Ideal house emailed us a revised quotation today. It's rounded up to 49k. Only 2k difference from the first one. However, it looks like we need to do alot of amendment to it cause we are still changing design for our house haha...

We are hoping to get HDB's contractor to help us with more items by topping up with cash. It should save us alot. And thanks to Drey, my new neighbour for sharing the info. Therefore, most likely, we will get HDB's contractor to help us to lay all the tiles, laminate floorings and hopefully to change but not supply a new W.C.

We spent about an hour in IKEA. I took pictures of ideas I liked.

1) Book Shelf. Not this size but similar. Actually I like it white. But he prefers this brown black. Anyway, I convinced myself with this cos IKEA's white tends to turn yellow. =)
2) Wow, the shower area is definitely a cost saving idea. Checked! This for common bathroom! =)

3) I LOVE white kitchen, the cabinets and solid surface top! LOVE LOVE LOVE! He nagged at me non-stop, reminding me how difficult it's going to maintain. -_-

4) I am going to have a work top like this. Slightly lower at waist line. We can also have quick meals or breakfast here. =)
4) The black cabinet on top is easy to reach and sleek. I like!!

At paragon a few days back, saw this panels at XQZT(?) I thought it's something different compared to the string curtains nowadays. It's $198 for 20 pieces. Hmmmm... it seemed a bit pricey... well, can consider still.

Monday, March 17, 2008

Hack here, Hack there...

Nope, we have not decided on the reno firm yet. However, we have requested HDB to hack the floor tiles without replacing and it's FOC. We also paid $330 to have the toilets and kitchen wall tiles to be hacked. =) My dad commented, $330 CAN LOR... wakakaka.... Alright, let's take a look at Sengkang Compassvale St EA again...


Above is the view of the living from the entrance and the entrance to the kitchen just after you step into the house. =) My dad, inspecting with his past carpentry experiences.


From our living, you see the view of passage ways to all rooms. This unit comes with an open concept study room. Thanks Bangladesh for that picture effect.


It's another entrance to the kitchen, also meaning, the kitchen has 2 exits. As far as I know, most of my neighbours conceal them with doors. We are planning to do the same. Haha... Picture below is bedroom 3. Consider full height window i guess.



It's bedroom 2 with full height window. I didn't have a picture of master bedroom. It does not come with a full ht window though. :s Cannot understand. Anyway, we are going to have our bed in bedroom 2.


The condition of our common and master bedroom toilets now.